Pumping up capacity at Ballarat South Wastewater Treatment plant

Pumping up capacity at Ballarat South Wastewater Treatment plant

Since the construction of the Ballarat South Wastewater Treatment Plant (BSWWTP) in 1925, the population of Ballarat has grown, compliance requirements have changed, and technologies have advanced. To keep up with these changes and to mitigate challenges associated with storm events, Central Highlands Water undertook a major upgrade of the plant, which involved the installation of new Archimedes screw pumps, and new coarse and fine screens.

The post Pumping up capacity at Ballarat South Wastewater Treatment plant appeared first on Pump Industry Magazine.

Read rest of article
Source: Pump Industry Magazine