Overhauling Murrumbidgee Irrigation infrastructure

Overhauling Murrumbidgee Irrigation infrastructure

More than 2,500ML of water is set to return to the environment from across Griffith and Leeton after the Federal Government green-lit the Murrumbidgee Irrigation Urban Channel Pipelines proposal.  
Image: 169169/stock.adobe.com

More than 2,500ML of water is set to return to the environment from across Griffith and Leeton after the Federal […]

The post Overhauling Murrumbidgee Irrigation infrastructure appeared first on Pump Industry Magazine.

Read rest of article
Source: Pump Industry Magazine