Winter works wrapped up by Murray Irrigation

Winter works wrapped up by Murray Irrigation

An excavator installs a block bank on the Mulwala Canal.
An excavator installs a block bank on the Mulwala Canal. Image: Murray Irrigation

Murray Irrigation has wrapped up its 2024 Winter Works program, completing approximately $8 million in improvement and maintenance works across […]

The post Winter works wrapped up by Murray Irrigation appeared first on Pump Industry Magazine.

Read rest of article
Source: Pump Industry Magazine