Optimising the Bonny Hills Wastewater Treatment Plant to cater for population growth

Optimising the Bonny Hills Wastewater Treatment Plant to cater for population growth

Built in the mid 1980s, the Bonny Hills Wastewater Treatment Plant (formerly known as Bonny Hills Sewerage Treatment Plant) services the Bonny Hills and Lake Cathie catchments. It was originally designed as a 9,000 Equivalent Person (EP) activated sludge pasveer sewerage treatment plant with sludge lagoons and detention ponds with the discharge going to a seepage trench along a sand […]

The post Optimising the Bonny Hills Wastewater Treatment Plant to cater for population growth appeared first on Pump Industry Magazine.

Read rest of article
Source: Pump Industry Magazine